PENERAPAN METODE CPM DAN PERT PADA PT. XYZ DALAM PEMBANGUNAN PROYEK APARTEMEN GARDEN DI TANGERANG

  • Danang Prihandoko, ST, MM Bina Nusantara University
  • Tesar Klinzabilal Universitas Bina Nusantara
  • Teuku Muhammad Rifqi Universitas Bina Nusantara
  • Vior Ezki Universitas Bina Nusantara
Keywords: Critical Path Method (CPM),, Project Evaluation and Review Technique (PERT),, Project Management.

Abstract

Growth property business in Indonesia since the last years has been growth significantly; it’s marked by the increase of property prices in Indonesia due to 2017. PT XYZ is one of company engaged in property business or real estate. At this time PT XYZ was currently conducting project development for Apartement located in Alam Sutera, Tangerang. The purpose of this research is to find out the application of the Critical Path Method and PERT method that can be applied to the apartment project, to compare the costs before and after using the Critical Path Method and PERT method, to determine the effectiveness and efficiency of using Crashing Program on the Apartment project. To optimize the development project, Therefore, they need a mature and structured Project Management to finish project to avoid delay. Hence, researchers tried to apply a method that approach optimization by using the Critical Path Method (CPM) and Project Evaluation and Review Technique (PERT) in Project Management, to be able to maximize profit and reduce the risk loss for the company and consumers.

References

Adebowale, S.A. and Oluboyede, E.D. (2011). Network analysis and building construction:

Implications for timing and costing of activities. Journal of Civil Engineering and Construction Technology. 2(5), 90-100.

Adedeji, A. A., & Bello, J. A. (2011). CONSTRUCTION PROCEDURE OF A STRAW

BALE WALLED BUILDING-A REVEW. Annals of the Faculty of Engineering Hunedoara, 9(3), 255.

Aziz, R. F. (2014). RPERT: Repetitive-projects evaluation and review technique. Alexandria Engineering Journal, 53(1), 81-93.

Dimyati, H.A. Hamdan & Nurjaman, K. (2014). Manajemen Proyek. Cetakan Pertama. Bandung: Pustaka Setia.

Heizer, J, H. & Render, B. (2011). Operations Management. New York : Pearson.

Heizer, J dan Render, B (2014). Operation Management Sustainability and Supply. England: Pearson Education Limited.

https://biropemerintahan.bantenprov.go.id/profil-kota-tangerang-selatan

https://www.infojabodetabek.com/luas-wilayah-dan-jumlah-penduduk-jabodetabek/

Mallon, M. (2015). Project Management. Public Services Quarterly, 11(2), 114-122.

Nurhayati. (2010). Manajemen Proyek. Jogjakarta: Graha Ilmu.

Render, Stair, Jr, & Hanna. 2012. Quantitative Analysis for Management. New York : Pearson

Prentice Hall.

Rizki Ridho, M, Syahrizal. (2012). Evaluasi Penjadwalan Waktu dan Proyek dengan Metode PERT dan CPM.. Jurnal Teknik Sipil Universitas Sumatera Utara, Vol 1 No.1.

Roshalia, O. (2017). Evaluasi Penjadwalan Waktu Dan Biaya Proyek Dengan Menggunakan Critical Path Method (CPM) Dan Project Evaluation And Review Technique (PERT) (Doctoral dissertation, STIE Ekuitas).

Shankar, N. R., Saradhi, B. P., & Babu, S. S. (2013). Fuzzy critical path method based on a new approach of ranking fuzzy numbers using centroid of centroids. International Journal of Fuzzy System Applications (IJFSA), 3(2), 16-31.

Sharma. (2016). Operation Research PERT, CPM & Cost Analysis. New Delhi: Discovery Publishing House.

Yang, J. B. (2017). Reviewing construction schedule float management. The Open Construction & Building Technology Journal, 11(1).

Published
2022-08-04